Reference Code I/2-348
Title Through the timberyards of Mao Ce Dun hydropower station
Synopsis Welding and assembly of high voltage poles reaching 45m in height. High tension poles are placed. Work inside the Mao Ce Dun hydropower plant site .Work at the hydropower plant dam. The construction of the curtain against water penetration. The work site no. 1 in Qyrsac. Connection of bars for concreting. The work site no. 2 where the pipes are laid. Win by placing an iron pipe beam, which reaches several tons. Chinese and Albanian specialists are seen working. Electric conveyor transporting concrete. Workers compacting cement and burning. Welders working.
Awards
Screenwriter
Scriptwriter Shkelzen Shala
Director Shkelzen Shala
Composer Mira Mamaqi
Camera Hamdi Ferhati
Designer
Editing
Sound Asim Raxhimi
Category Documentaries
Chroma
Year 1970
Release date 1970
Reels 1
Lenght (in minutes) 7
Country of origin Shqiperi
Shooting locations
Producers Kinostudio “Shqiperia e re”
Notes